BUILDING 1 PDF Files

 

A.1.1a (Floor Plan)-Layout 1

A.1.b (Floor Plan)-Layout 1

A.1.2a (Floor Finish Plan)

A.1.2b (Floor Finish Plan)

A.1.3a (Reflected Ceriling Plan)

A.1.3b (Reflected Ceriling Plan)

A.1.4a (Roof Plan)

A.1.4b (Roof Plan)

A.1.5 (Roof Ladder Detail)

A.2.1 (Elevations)

A.2.2 (elevations)

A.2.3 (Interior Elev.)

A.2.4a (Interior Elev.)

A.2.4b (Interior Elev.)

A.2.5 (Interior Elev.)

A.2.6 (Interior Elev.)

A.2.7 (Graphic Elev.)

A.3.1 (Sections)

A.3.2 (Ext. Wall Sect.)

A.3.3 (Ext. Wall Sect.)

A.3.4 (Int. Wal Sect.)

A.5.1 (Exterior Details)

A.5.2 (Door & Wind)

A.6.1 (Trellis Details)

A.7.1 (Trash Enclosure & Details)

AS1-1 (Arch Site Plan)

DAR 1 Disabled Requ

DAR 2 Disbled Requ

DAR 3 Disabled Requ

A.1.1a Floor Plan Security Camera

A.1.1b Floor Plan Security Camera

A.1.1 Car Wash & Lube Security Camera

Site Plan Security Camera

F.5.1 (Coffee Counter Mill)

F.5.2 (Fount. Counter Mill)

F.5.3a (Sales Counter Mill)

F.5.3b (Sales Counter Mill)

F.5.3c (Sales Counter Mill)

F.5.4 (Sales Counter Mill)

F.5.5 (Prep. Island Mill)

F.5.6 (Q.S.R. Counter Mill)

G.0.1 (C-Store-Sheet)

G.0.2 (C-Store-Sheet)

Q.1.1a (Equipment Plan)

Q.1.1b (Equipment Plan)

Q.4.1 (Cooler Package)

Q.4.2 (Cooler Package)

Q.6.1 (Equipment Schedule)

Q.6.2 (Equipment Schedule)

 

 

 

 

 

 

 

For more information please contact: Ali Mazarei
Copyright © 2003 pinnaclereholdings.com
All Rights Reserved.