A.1.1a (Floor
Plan)-Layout 1
A.1.b
(Floor Plan)-Layout 1
A.1.2a
(Floor Finish Plan)
A.1.2b (Floor Finish Plan)
A.1.3a
(Reflected Ceriling Plan)
A.1.3b (Reflected Ceriling
Plan)
A.1.4a (Roof Plan)
A.1.4b (Roof Plan)
A.1.5 (Roof Ladder Detail)
A.2.1 (Elevations)
A.2.2 (elevations)
A.2.3
(Interior Elev.)
A.2.4a
(Interior Elev.)
A.2.4b
(Interior Elev.)
A.2.5
(Interior Elev.)
A.2.6 (Interior
Elev.)
A.2.7
(Graphic Elev.)
A.3.1 (Sections)
A.3.2
(Ext. Wall Sect.)
A.3.3
(Ext. Wall Sect.)
A.3.4
(Int. Wal Sect.)
A.5.1
(Exterior Details)
A.5.2
(Door & Wind)
A.6.1
(Trellis Details)
A.7.1 (Trash Enclosure
& Details)
AS1-1 (Arch Site Plan) |
DAR
1 Disabled Requ
DAR
2 Disbled Requ
DAR
3 Disabled Requ
A.1.1a
Floor Plan Security Camera
A.1.1b
Floor Plan Security Camera
A.1.1
Car Wash & Lube Security Camera
Site
Plan Security Camera |
F.5.1
(Coffee Counter Mill)
F.5.2
(Fount. Counter Mill)
F.5.3a
(Sales Counter Mill)
F.5.3b
(Sales Counter Mill)
F.5.3c
(Sales Counter Mill)
F.5.4
(Sales Counter Mill)
F.5.5
(Prep. Island Mill)
F.5.6
(Q.S.R. Counter Mill)
G.0.1
(C-Store-Sheet)
G.0.2 (C-Store-Sheet) |
Q.1.1a
(Equipment Plan)
Q.1.1b (Equipment
Plan)
Q.4.1
(Cooler Package)
Q.4.2 (Cooler
Package)
Q.6.1
(Equipment Schedule)
Q.6.2
(Equipment Schedule) |